Project at Santa María de la Cabeza
Cabbsa has been appointed to carry out the comprehensive structural refurbishment of the building located on Paseo de Santa María de la Cabeza in Madrid and is currently executing the
This section showcases some of the more than 3,000 projects completed since 1926. These projects span a variety of types and sectors, each a testament to Cabbsa’s experience and dedication.
Cabbsa has been appointed to carry out the comprehensive structural refurbishment of the building located on Paseo de Santa María de la Cabeza in Madrid and is currently executing the


Located within the monumental complex of the Royal Basilica of San Francisco el Grande (a listed heritage site featuring the world’s third-largest dome, after the Pantheon in Rome and St.

Technically complex structural alternatives are being evaluated, potentially representing a milestone for buildings of this kind. In a second phase, the developer will configure the new residential units, which will

In one of the most important mental health clinics in Spain, Cabbsa has been contracted by the multinational Group EMEIS (formerly Orpea) to rehabilitate and adapt to regulations this emblematic

This building dates back to 1904 and was awarded the Madrid City Hall prize for the ‘Best House Built’ in 1907. It is a protected building in its fundamental elements.

The structural works were carried out first, followed by the completion of the building envelope and interior finishes. This building occupies a unique location in Madrid (Plaza de Colón), and

The 8,950 m² complex comprises three six-story buildings plus a basement, all interconnected via walkways. The historical glass-block façade of the former Unión Farmacéutica Guipuzcoana headquarters will be preserved. The

In a joint venture with Ferrovial, Cabbsa is finalizing the construction of the new Club de Mar in Mallorca. The project includes offices, commercial premises, port infrastructure, and recreational areas.

The residence consists of a seven-story building above ground level plus a basement, with a total built area of 6,233 m² on a 2,500 m² plot, including 1,485 m² of